Schneider Electric Infrastructure receives GST order for ₹3.8 crore demand and penalty
Schneider Electric Infrastructure Limited received a GST adjudication order for FY 2022-23. The order includes demands for IGST totaling ₹3.50 crore for alleged non-payment of GST on exports and ineligible ITC. A penalty of ₹35.18 lakh has also been imposed. The company is evaluating legal remedies, stating no material impact on its operations.
Read the summary - Medium impact
Schneider Electric Infrastructure Q1 FY27 Earnings Call Transcript Released
Schneider Electric Infrastructure released its Q1 FY27 earnings call transcript. The company achieved its highest-ever quarterly order booking at ₹915 crore. Sales grew 5% YoY, with a strong backlog of over ₹2,100 crore. Gross margins were impacted by commodity inflation and legacy orders. Management discussed India's strong macroeconomic outlook and the company's focus on emerging segments like data centers and semiconductors.
Read the summary - Low impact
Schneider Electric Infrastructure Ltd. Announces 16th AGM on Sep 10, 2026, via Video Conference
Schneider Electric Infrastructure Limited will hold its 16th AGM on September 10, 2026, via Video Conference. The notice and annual report for FY25-26 were dispatched on August 18, 2026. Remote e-voting will be open from September 7 to September 9, 2026. The cut-off date for voting rights is September 3, 2026.
Read the summary - Low impact
Schneider Electric Infrastructure Ltd. announces 16th AGM on Sep 10, 2026, to discuss FY26 Annual Report
Schneider Electric Infrastructure Ltd. will hold its 16th AGM on September 10, 2026, to discuss the FY26 Annual Report. The report and AGM notice have been emailed to registered shareholders. A special window for physical security transfer/dematerialization remains open until February 4, 2027.
Read the summary - Medium impact
Schneider Electric Infrastructure Ltd. Announces 16th AGM on Sep 10, 2026
Schneider Electric Infrastructure Limited will hold its 16th AGM on September 10, 2026, virtually. Key agenda items include adopting FY26 financials, re-appointing Udai Singh as MD & CEO for 3 years, appointing Soumya Bagchi as WTD for 3 years, and appointing Nirupa Chander as a Non-Executive Director. E-voting is open from Sep 7-9, 2026.
Read the summary - Low impact
Schneider Electric Infrastructure Q1 FY27 Earnings Call Transcript Released
Schneider Electric Infrastructure Limited released the audio recording of its Q1 FY27 earnings call held on August 17, 2026. The call discussed the unaudited financial results for the quarter ended June 30, 2026. The recording is available on the company's investor website.
Read the summary - Low impact
Schneider Electric Infrastructure Ltd. Announces 16th AGM on Sep 10, 2026
Schneider Electric Infrastructure Limited will hold its 16th AGM on September 10, 2026, via video conferencing. The Annual Report for FY 2025-26 will be shared via email by August 14, 2026. E-voting facilities will be available. A special window for dematerialization of physical securities is open until February 4, 2027.
Read the summary - Medium impact
Schneider Electric Infrastructure Q1 FY27 Investor Presentation Released
Schneider Electric Infrastructure released its Q1 FY27 investor presentation on August 17, 2026. The company reported its highest-ever quarterly order intake. The presentation details the company's vision for the digitized energy world and its strategic focus on India's growth engines.
Read the summary - Low impact
Schneider Electric Infrastructure Ltd. Publishes Q1 FY27 Unaudited Financial Results
Schneider Electric Infrastructure Limited published its unaudited financial results for the first quarter ended June 30, 2026. The results were advertised on August 15, 2026, and are available on the company's website.
Read the summary - Medium impact
Schneider Electric Infrastructure Q1 FY27 Results: Net Profit Declines to ₹1,244 Lakh
Schneider Electric Infrastructure reported Q1 FY27 results with net profit at ₹1,244 lakh. Revenue from operations was ₹65,136 lakh. The company appointed Mr. Soumya Bagchi as Whole-Time Director and Ms. Nirupa Chander as Non-Executive Non-Independent Director, both effective August 14, 2026. Mr. Devendra Kumar Sharma was appointed Internal Auditor.
Read the summary - Medium impact
Schneider Electric Infra Q1 FY27: Record Order Intake of ₹915 Cr, Revenue Grows 4.8% YoY
Schneider Electric Infrastructure Ltd (SEIL) reported its Q1 FY27 results with a record order intake of ₹915 crore. Revenue grew 4.8% YoY to ₹651 crore. EBIT was ₹32.1 crore. The order backlog stands strong at ₹2169 crore.
Read the summary - Medium impact
Schneider Electric Infrastructure Q1FY27 Results: Net Profit Declines to ₹1,244 Lakh
Schneider Electric Infrastructure Limited reported Q1FY27 results with total income at ₹65,827 lakh and net profit at ₹1,244 lakh. This marks a decrease from previous periods. The company also announced the resignation of its Internal Auditor, Mr. Vinay Kumar Awasthi, and the appointment of Mr. Devendra Kumar Sharma. Additionally, Mr. Soumya Bagchi was appointed as Whole-Time Director, and Ms. Nirupa Chander as Non-Executive Non-Independent Director.
Read the summary - Low impact
Schneider Electric Infrastructure Ltd Schedules Investor Conference Call for Q1 FY27 Results on Aug 17
Schneider Electric Infrastructure Limited will hold an investor conference call on August 17, 2026, at 10:00 AM IST to discuss its Q1 FY27 unaudited financial results. The call will include MD & CEO, CFO, and Head of Investor Relations.
Read the summary - Medium impact
Schneider Electric Infrastructure Limited Receives Appeal Order on GST Credit Demand
Schneider Electric Infrastructure Limited received an appeal order from CGST Appeals, Noida, dated July 29, 2026. The order upholds demands of ₹9,57,641 for CENVAT credit and ₹2,58,549 for hotel booking services, along with interest. A revised penalty of ₹12,16,190 was imposed. The company is evaluating legal remedies, stating no material financial impact.
Read the summary - Medium impact
Schneider Electric Infrastructure shareholders approve Material Related Party Transaction
Schneider Electric Infrastructure Limited shareholders approved a Material Related Party Transaction with Schneider Electric IT Business India Private Limited. The resolution passed with over 99.98% of votes in favor. Remote e-voting concluded on July 3, 2026.
Read the summary - Low impact
Schneider Electric Infrastructure Appoints Soumya Bagchi as Additional Director
Schneider Electric Infrastructure Limited appointed Mr. Soumya Bagchi as Additional Non-Executive Director and Senior Management Personnel. The appointment is effective June 30, 2026, subject to shareholder approval. Mr. Bagchi brings over 30 years of experience in the electrical and automation sector.
Read the summary - Low impact
Schneider Electric Infrastructure: Trading Window Closed from July 1, 2026 for Q1 FY27 Results
Schneider Electric Infrastructure Limited will close its trading window from July 1, 2026. The closure is in effect until 48 hours after the announcement of the Unaudited Financial Results for the first quarter ending June 30, 2026. The board meeting date for approving these results will be announced later.
Read the summary - Medium impact
Schneider Electric Infrastructure: Whole-Time Director Chinmoy Das Resigns
Mr. Chinmoy Das has resigned as Whole-Time Director of Schneider Electric Infrastructure Limited due to personal reasons. His resignation is effective June 30, 2026. He will also cease to be Senior Management Personnel and Occupier of factories.
Read the summary - Medium impact
Schneider Electric Infrastructure Director Chinmoy Das Resigns Effective June 30
Mr. Chinmoy Das has resigned as Whole-Time Director of Schneider Electric Infrastructure Limited due to personal reasons. His resignation is effective June 30, 2026. He will also step down as Senior Management Personnel and Occupier of factories on the same date.
Read the summary - Low impact
Schneider Electric Infra Clarifies Parent's Tie-up with Foxconn Not Applicable to SEIL
Schneider Electric Infrastructure Limited clarified that a reported tie-up between its parent and Foxconn for AI data centers was not entered into by SEIL. The arrangement was executed by another Schneider Electric Group entity. SEIL confirmed no other material information requires disclosure.
Read the summary - Low impact
Schneider Electric Infrastructure Ltd. Publishes Newspaper Advertisement for Postal Ballot
Schneider Electric Infrastructure Limited published a newspaper advertisement on June 4, 2026, for a Postal Ballot notice dated May 28, 2026. E-voting is open from June 4 to July 3, 2026. A special window for physical security transfer and dematerialization is open until February 4, 2027.
Read the summary - Low impact
Schneider Electric Infrastructure Limited's Penalty Reduced by ₹83.28 Lakhs in Rectification Order
Schneider Electric Infrastructure Limited's penalty for wrong Input Tax Credit in FY19-20 has been reduced by ₹83.28 Lakhs. The Rectification Order from Joint Commissioner, Vadodara, received on June 2, 2026, confirms the tax amount but significantly lowers the penalty. The company stated no material financial impact.
Read the summary - Medium impact
Schneider Electric Infrastructure seeks approval for ₹605 Cr related party transaction
Schneider Electric Infrastructure is seeking member approval for material related party transactions with Schneider Electric IT Business India Private Limited, up to ₹605 Crores for FY26-27. E-voting starts June 4, 2026, and ends July 3, 2026. Results will be announced by July 7, 2026.
Read the summary - Medium impact
Schneider Electric Infrastructure Q4 FY26 Earnings Call Transcript Released
Schneider Electric Infrastructure released its Q4 FY26 earnings call transcript. The company received two Golden Peacock Awards and highlighted market opportunities in energy transition, manufacturing, and data centers. While 12-month orders grew 27.4% and sales 9.6%, Q4 saw flat sales due to delivery deferrals. Management discussed new digital grid and energy storage solutions.
Read the summary - Low impact
Schneider Electric Infrastructure Ltd. Publishes Audited Financial Results for FY26
Schneider Electric Infrastructure Limited announced its audited financial results for the fourth quarter and fiscal year ended March 31, 2026. The results were approved by the board on May 28, 2026. The detailed financial statements are available on the company's website and stock exchange platforms.
Read the summary - Low impact
Schneider Electric Infrastructure Q4 FY26 Earnings Call Recording Available
Schneider Electric Infrastructure released the audio recording for their investor conference call held on May 29, 2026. The call discussed the audited financial results for the 4th quarter and financial year ended March 31, 2026.
Read the summary - Low impact
Schneider Electric Infrastructure Ltd. Announces Newspaper Publication of Audited Financial Results
Schneider Electric Infrastructure Limited published its audited financial results for the quarter and year ended March 31, 2026. The results were advertised on May 29, 2026, in "The Financial Express". The information is also available on the company's website.
Read the summary - Medium impact
Schneider Electric Infrastructure Investor Presentation for FY26 Audited Results
Schneider Electric Infrastructure presented its FY26 audited results. Sales grew 9.6% YoY to ₹2,891 crore and orders increased 27.4% YoY to ₹3,430 crore. The company received the 'Golden Peacock Award - Innovative Product/Service 2026' and for ESG – 2025. New products include Trihal transformers and a One Digital Grid platform.
Read the summary - Medium impact
Schneider Electric Infrastructure FY26 Orders Grow 27.4% to ₹3,430 Cr; Q4 Revenue Up 0.5%
Schneider Electric Infrastructure reported FY26 orders grew 27.4% to ₹3,430 crore and revenue increased 9.6% to ₹2,891 crore. Q4 FY26 orders rose 1.4% to ₹772 crore, while revenue was steady at ₹590 crore. PBT before exceptional items for FY26 declined 8.1% to ₹306 crore. The company's backlog increased 50.1% to ₹1,911 crore.
Read the summary - Medium impact
Schneider Electric Infrastructure Ltd. Board Approves FY26 Results, Reappoints MD & CEO
Schneider Electric Infrastructure Limited's Board approved FY26 audited results. Net profit for FY26 was ₹212.56 crore, down from ₹267.89 crore in FY25. Revenue from operations rose to ₹2,908.63 crore from ₹2,636.71 crore. Mr. Udai Singh was re-appointed MD & CEO for three years from Sept 15, 2026. The 16th AGM is scheduled for Sept 10, 2026.
Read the summary - Medium impact
Schneider Electric Infrastructure Board Approves FY26 Results, Reappoints MD & CEO
Schneider Electric Infrastructure's Board approved audited financial results for FY26. Mr. Udai Singh was re-appointed as MD & CEO for three years from Sept 15, 2026. Cost and Internal Auditors were also re-appointed for FY27. The 16th AGM is scheduled for Sept 10, 2026.
Read the summary - Medium impact
Schneider Electric Infrastructure Board Approves FY26 Results, Reappoints MD & CEO
Schneider Electric Infrastructure Limited reported audited financial results for FY26. The company's net profit for the year ended March 31, 2026, was ₹21,256 lakh. Mr. Udai Singh was re-appointed as MD & CEO for three years from September 15, 2026. The 16th AGM is scheduled for September 10, 2026.
Read the summary - Low impact
Schneider Electric Infrastructure to Hold Investor Call on Q4 FY26 Results on May 29
Schneider Electric Infrastructure will host an investor conference call on May 29, 2026, at 11:30 AM IST. The call will discuss the audited financial results for the fourth quarter and the financial year ended March 31, 2026. Management will present the company's performance.
Read the summary - Low impact
Schneider Electric Infrastructure RTA Merges with MUFG Intime India
Schneider Electric Infrastructure Limited's Registrar and Share Transfer Agent, CB Management Services Private Limited, has merged with MUFG Intime India Private Limited. This merger is effective from May 8, 2026. The RTA's name will change to MUFG Intime India Private Limited, with SEBI Registration No. INR000004058. Services to shareholders will remain unaffected.
Read the summary - Low impact
Schneider Electric Infrastructure Ltd Confirms Non-Applicability of SEBI Large Corporate Norms for FY27
Schneider Electric Infrastructure Limited confirms it is not classified as a "Large Corporate" for FY 2026-27 as per SEBI guidelines. The company meets the criteria for non-applicability as of March 31, 2026. This disclosure follows SEBI Circular No. SEBI/HO/DDHS/DDHS-RACPOD1/P/CIR/2023/17.
Read the summary - Low impact
Schneider Electric India Announces Special Window for Physical Share Transfer
Schneider Electric Infrastructure Limited has opened a special one-year window from February 5, 2026, to February 4, 2027, for re-lodging transfer requests of physical shares. This applies to shares lodged before April 1, 2019, that were rejected or returned. Transferred shares will be issued in demat form.
Read the summary - Low impact
Schneider Electric Infrastructure: Certificate under SEBI (Depositories and Participants) Regulations, 2018
Schneider Electric Infrastructure Limited submitted a certificate under SEBI (Depositories and Participants) Regulations, 2018, for the quarter ended March 31, 2026. The certificate confirms the processing and cancellation of dematerialized securities.
Read the summary - Low impact
Schneider Electric Infrastructure Ltd Promoter Holds 168,735,367 Shares, No Encumbrance
Energy Grid Automation Transformers and Switchgears India Private Limited, Promoter of Schneider Electric Infrastructure Ltd, holds 16,87,35,367 shares as of March 31, 2026. No shares were encumbered or pledged during FY26.
Read the summary - Low impact
Schneider Electric Singapore Pte. Ltd. confirms no shares encumbered as of March 31, 2026
Schneider Electric Singapore Pte. Ltd., holding 1,05,92,659 shares in Schneider Electric Infrastructure Limited as of March 31, 2026, confirms no shares were encumbered or pledged. This declaration is in compliance with SEBI Takeover Regulations.
Read the summary - Medium impact
Schneider Electric Infrastructure Revises Vadodara Plant Capex to ₹156.4 Crores
Schneider Electric Infrastructure Limited's Board approved a revised capital expenditure of ₹156.4 Crores for its Vadodara plant, an increase from ₹110.2 Crores. This enhancement aims to support future scalability in switchgear production. The Board meeting concluded on March 27, 2026.
Read the summary - Medium impact
Schneider Electric Infrastructure shareholders approve WESOP and related party transactions
Schneider Electric Infrastructure Limited shareholders approved the 2026 WESOP and material related party transactions with three entities. The resolutions passed with strong majority, deemed approved on March 25, 2026. The voting period concluded on March 25, 2026.
Read the summary - Low impact
Schneider Electric Infrastructure: Trading Window Closed from April 1, 2026, for FY26 Audited Results
Schneider Electric Infrastructure Limited will close its trading window from April 1, 2026. The window will reopen 48 hours after the announcement of audited financial results for the fiscal year ending March 31, 2026. The board meeting date for approving these results will be announced later.
Read the summary - Low impact
Schneider Electric Infrastructure Limited Receives ESG Rating of 75.6/100
Schneider Electric Infrastructure Limited received an ESG rating of 75.6 out of 100 for FY 2024-25 from SES ESG Research. The rating was voluntarily assigned by the agency based on publicly available data.
Read the summary - Low impact
Schneider Electric India Publishes Postal Ballot Notice, Invites E-Voting
Schneider Electric Infrastructure Limited is publishing its Postal Ballot Notice and is facilitating e-voting for members. The e-voting period is from February 24, 2026, to March 25, 2026. Shareholders can cast their votes electronically. A special window for physical security transfer and dematerialization is also open until February 4, 2027.
Read the summary - Medium impact
Schneider Electric Infrastructure Ltd. Seeks Shareholder Approval via Postal Ballot
Schneider Electric Infrastructure Ltd. is conducting a postal ballot for shareholder approval on the 2026 WESOP, involving employee share grants and financial assistance. Shareholders will also vote on material related party transactions: up to ₹520 Cr with SEITB, ₹700 Cr with SEIPL, and ₹400 Cr with SE SAS for FY27. E-voting is open from Feb 24 to Mar 25, 2026.
Read the summary - Low impact
Schneider Electric Infrastructure Gets ESG Rating of 70 - Aspiring
Schneider Electric Infrastructure Limited received an ESG Rating of 70, categorized as 'Aspiring', from NSE Sustainability Ratings & Analytics Limited for FY2024-25. The rating is based on publicly available data and reflects the company's performance across Environmental, Social, and Governance parameters.
Read the summary - Low impact
Schneider Electric Infrastructure to Meet Analysts/Investors on Feb 19, 2026
Schneider Electric Infrastructure Limited officials will meet analysts and investors on February 19, 2026. The meetings will include both physical and virtual one-on-one sessions. No Unpublished Price Sensitive Information will be shared.
Read the summary - High impact
Schneider Electric Infrastructure Q3 FY26 Earnings Call Transcript Released
Schneider Electric Infrastructure released its Q3 FY26 earnings call transcript. The company reported crossing INR 1,000 crores in quarterly sales for the first time, with a 60% YoY growth in order booking to INR 909 crores and a strong order backlog of INR 1,700 crores. Profitability before exceptional items grew by approximately 15% YoY for the quarter. Management highlighted growth drivers like digitalization, energy transition, and government capex, and launched a new India-made product, GMSeT.
Read the summary - Medium impact
Schneider Electric Infrastructure Ltd. Receives Stay Order on ₹17.12 Crore Tax Demand
Schneider Electric Infrastructure Limited secured a stay on a ₹17.12 crore income tax demand. The company must pay 20% (₹3.42 crore) in two installments by February 26 and March 26, 2026. The ITAT Ahmedabad Bench issued the stay order on February 13, 2026.
Read the summary - Low impact
Schneider Electric Infrastructure Q3 FY26 Earnings Call Transcript Released
Schneider Electric Infrastructure Limited released the audio recording of its Q3 FY26 earnings call held on February 13, 2026. The call discussed the un-audited financial results for the third quarter and nine months ended December 31, 2025. The recording is available on the company's investor relations website.
Read the summary
Model portfolios
Filings are the raw material. These are what SEBI-registered experts build from them.
- Stocks
Core Compounders
Companies that have already been through a downturn and came out still growing.
Moderate20 holdings3+ yearsView portfolio - Stocks
Udaan
Fast-growing, less-covered companies still early in their runway.
Aggressive29 holdings5+ yearsView portfolio - Stocks
Bharat Rising
Built around India's own shifts: capex, household savings, energy and consumption.
Moderate-Aggressive25 holdings3+ yearsView portfolio - Stocks
All-Terrain
One equity portfolio instead of three: large, mid and small cap in a single book.
Moderate-Aggressive34 holdings3+ yearsView portfolio