Diamond Power Secures ₹707.80 Crore Order for HVDC Transmission Project
Diamond Power Infrastructure Limited secured a ₹707.80 crore order from Adani Energy Solutions for AL-59 conductors for the ±800 kV HVDC Bhadla–Fatehpur transmission project. Deliveries are expected by December 31, 2027. This order signifies the company's entry into the HVDC transmission business.
The order value is substantial (₹707.80 crore) and represents a strategic entry into the high-voltage direct current (HVDC) transmission segment, which is a significant diversification and growth opportunity for the company.
The company has secured a large order, marking its entry into a new, high-voltage transmission segment, which is a positive development for business growth.
Diamond Power Infrastructure Limited has received a significant Purchase Order worth ₹707.80 crore (including GST) from Adani Energy Solutions Limited. This order is for the supply of 9,059.33 km of AL-59 conductors, including 8,948.33 km of AL-59 Lapwing and 111 km of AL-59 Moose conductors, for the ±800 kV HVDC Bhadla–Fatehpur transmission project. The basic value of the order, excluding GST, is ₹599.83 crore. The pricing is based on LME aluminium of USD 2,550 per MT, a premium of USD 106 per MT, and an exchange rate of USD/INR 87. The order is on a commodity back-to-back basis, with the final price subject to variation based on the average LME aluminium price and USD/INR rate of the month preceding scheduled dispatch, thus mitigating commodity price and currency risks for the company. This marks Diamond Power's entry into the High Voltage Direct Current (HVDC) transmission segment, a critical technology for transmitting large blocks of power over long distances with minimal losses. The ±800 kV voltage level is the highest currently in operation in India. The project itself is a crucial part of developing one of India's largest green energy corridors. The deliveries are scheduled to be completed month-wise by December 31, 2027. Mr. Kavish Shah, Vice President – Corporate Affairs, expressed optimism, stating that this milestone order positions the company in a niche segment and that they are well-equipped to meet the project's demands with their integrated facilities.
What to do with a filing like this
Diamond Power Infrastructure Limited filed this with the NSE as a statutory disclosure, categorised under new orders. It is a primary document, not a recommendation, and the desk marks it high impact, which is the band that most often changes something.
That call is the part a filing cannot make for you. On RealCase, SEBI-registered research analysts and investment advisers read announcements like this one and turn the ones that matter into actions inside their model portfolios: a change in weight, a hold, or nothing at all. You are not left working out which of the roughly 250 filings published each day needs a response. The portfolio you follow is updated when a filing actually warrants it, with the reason written down.
See the model portfoliosA plain-language summary of a public exchange filing by Diamond Power Infrastructure Limited. Read the original for the full detail.