Pace Digitek Secures Rs. 2,691 Crore BESS Order from NTPC Green Energy
Pace Digitek Limited secured its largest-ever BESS order worth ₹2,691 crore from NTPC Green Energy Limited. The contract includes EPC and 15-year O&M for a 600 MW / 1800 MWh BESS project at NTPC REL Khavda Solar Plant. This win elevates the company's executable order book to ₹13,427 crore.
The order value is substantial (₹2,691 crore) and represents the largest BESS order for the company, significantly impacting its revenue and market position in the energy storage sector.
The company secured its largest-ever order, significantly boosting its order book and demonstrating strong manufacturing and execution capabilities, which is a positive development.
Pace Digitek Limited has received a Letter of Award (LOA) from NTPC Green Energy Limited (NGEL) for a Battery Energy Storage System (BESS) project. The aggregate value of the award, including GST, is ₹2,691 crore (3300 million). This significant order encompasses the supply, system integration, installation, testing, commissioning, civil works, and 15 years of operations & maintenance for two blocks (Block-01 and Block-02), each 300 MW / 900 MWh, under Cluster-01 of the flagship 3300 MWh BESS Project at NTPC REL Khavda Solar Plant in Gujarat. This award represents the largest BESS order secured by Pace Digitek to date. The company's cumulative order inflows for FY2027 have reached ₹5,129 crore, increasing its total executable order book to ₹13,427 crore, with a consolidated BESS project portfolio of 6.62 GWh. Pace Digitek's ability to meet the Class-I Local Supplier criteria, supported by its 5 GWh operational domestic BESS manufacturing capacity and in-house fabrication facility, was crucial in securing this contract.
Mr. Venugopal Rao Maddisetty, Chairman & Managing Director of Pace Digitek Limited, stated that the order is a validation of the company's manufacturing scale, engineering depth, and project execution capabilities. He highlighted the role of local content and domestic manufacturing in advancing India's energy storage goals. The company has invested in expanding its manufacturing capacity, aiming for 10 GWh, to support growing market requirements. Pace Digitek operates as an integrated infrastructure and energy solutions provider across Energy and Telecom segments, with its subsidiary Lineage Power Private Limited manufacturing energy storage systems.
What to do with a filing like this
Pace Digitek Limited filed this with the NSE as a statutory disclosure, categorised under new orders. It is a primary document, not a recommendation, and the desk marks it high impact, which is the band that most often changes something.
That call is the part a filing cannot make for you. On RealCase, SEBI-registered research analysts and investment advisers read announcements like this one and turn the ones that matter into actions inside their model portfolios: a change in weight, a hold, or nothing at all. You are not left working out which of the roughly 250 filings published each day needs a response. The portfolio you follow is updated when a filing actually warrants it, with the reason written down.
See the model portfoliosA plain-language summary of a public exchange filing by Pace Digitek Limited. Read the original for the full detail.